Application
This unit specifies the skills and knowledge to select and install insulation, roof battens and wall cladding involving metallic, non-metallic or other approved roof covering materials.
In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
What You'll Learn
1.
2.
3.
4.
5.
6.
Assessment Requirements
Performance Evidence
To demonstrate competency, a candidate must meet the performance criteria of this unit by:
• installing steel claddings to structures not less than 2 metres wide and 1.5 metres long including:
• a flat deck roof system to a pitch ≥ 1° using concealed fixing method and installing safety wire mesh, blanket and foil
• a pitched roof system ≥ 5° using an approved pierced fixing method and incorporating:
• a valley, hip, ridge and barge
• thermal insulation containing a blanket and foil for fire management
• a non-structural cladded roof over rigid support using concealed fixing method including valley, hip, ridge, barge and roof discharge detail and moisture control pliable membrane
• a sandwich panel roof or wall over supports using pierced fixing method with a minimum of two panels
• a non-metallic roof sheet using pierced fixing and installing safety wire mesh
• wall cladding incorporating side lapping with one external and internal corner and toe mould and including:
• an opening of 300 x 600 mm
• pliable building membrane.
Knowledge Evidence
To be competent in this unit, a person must demonstrate knowledge of:
• reading and interpreting plans, including electronic plans
• current standards and codes for roof sheeting and insulation:
• HB39 Installation Code for metal roof and wall cladding
• National Construction Code (NCC)
• AS 1562 Design and installation of sheet roof and wall cladding
• AS 4200.2 Pliable building membranes and underlays - Installation
• AS 3999 Bulk thermal insulation - Installation
• calculation of material quantities
• receival, storage, protection and checking quantities for delivery of roofing materials
• roof components:
• insulation to meet thermal acoustic, moisture and fire control
• safety mesh
• rigid supports
• roof and safety battens
• fixings and fasteners
• metal and non-metallic roofing sheets
• sandwich panel
• thermal breaks and approved sealants
• capillary action and thermal expansion
• corrosion control
• weathering
• unloading and storage of roof materials following manufacturers’ instructions:
• stacking dunnage
• environmental protection
• conformity of materials against the delivery docket
• work health and safety (WHS) requirements:
• working at heights
• fragile materials
• asbestos containing materials
• selecting and installing roof sheeting and wall cladding
• overhead hazards
• installation in bushfire prone areas and requirements of The National Association of Steel-Framed Housing (NASH) Standard for construction in bushfire areas or AS 3959 Construction of buildings in bushfire-prone areas
• how to access relevant information, including codes and standards
• tools, materials and equipment used to select and install roof sheeting and wall cladding.
Assessment Conditions
Assessors must meet the requirements for assessors contained in the Standards for Registered Training Organisations.
This unit must be assessed in the workplace or a close simulation using realistic workplace conditions, materials, activities, responsibilities, procedures, safety requirements and environmental considerations.
Foundation Skills
- {'skill': 'Foundation Skills', 'description': 'Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.'}
Prerequisite Units
Related Units
-
CPCCPA3003 — Cut segmental paving
Same training package
-
CPCCCA3025 — Read and interpret plans, specifications and drawings for carpentry work
Same training package
-
CPCSUS4003 — Maximise energy efficiency through applied trade skills
Same training package
-
CPCCSP2001 — Handle solid plastering materials
Same training package
-
CPCCCO2014 — Carry out concrete work
Same training package
-
CPCPSN3011 — Plan the layout of a residential sanitary plumbing system and fabricate and install sanitary stacks
Same training package
Generate Compliant Training Materials for CPCPRF2022
RTOFlow automatically creates learner guides, assessment workbooks, marking guides, and trainer resources aligned to this unit of competency — saving you weeks of manual work.
Request Early AccessLast updated from training.gov.au: 08 March 2026